Office furniture and labelled boxes being moved into a new office

To move an office without losing a day of work, plan early, move your IT and critical systems in a controlled order, schedule the physical move outside trading hours where possible, label everything by desk and department, and have a small team on both sides on the day. Done well, staff can pack up on a Friday and be working at the new office on Monday.

Downtime is the real cost of an office move. Rent and wages continue whether people can work or not, so every hour the team spends looking for a monitor or waiting on the internet is money lost. The good news is that most downtime is caused by poor sequencing, not by the move itself. This guide walks through how to plan around it.

Key Takeaways

  • Start planning as early as you can, and longer for bigger offices.
  • Appoint one move coordinator and a small team across departments.
  • Get internet, power and IT set up at the new office before moving day.
  • Ask about early-morning, evening or weekend moving so trading hours are protected.
  • Label by person and location, not just by box number.
  • Tell your removalist about access, lifts and loading areas at both buildings.

Step 1: Set the Date, the Scope and the Owner

Pick a moving window that suits your business. A quiet period, or the end of a week, gives you a buffer. Check your lease end date and any building rules, such as lift bookings or loading dock hours, at both addresses.

Then choose one person to run the move. Add a few helpers from different teams: someone for IT, someone for facilities or admin, and a contact for each department. One clear decision-maker prevents the confusion that creates delays.

Step 2: Sort Out IT and Connectivity First

Technology is the most common reason an office is not working on day one. Before anything is packed:

  • Confirm internet, phone lines and power at the new site are connected and tested.
  • Back up your data and confirm who is disconnecting and reconnecting servers, phones and network equipment. Under our terms, we do not disconnect or reconnect appliances or handle specialised equipment that needs licensed professionals unless agreed in writing, so your IT provider usually handles this part.
  • Photograph or label cable layouts so workstations can be rebuilt quickly.
  • Plan a simple fallback, such as remote work, for any systems that take longer to bring online.

Computers and monitors also need careful handling in transit. Our guide to moving electronic devices safely has useful tips you can share with your team.

Office worker packing a box during a workplace relocation

Step 3: Declutter Before You Pack

Every filing cabinet, spare chair and box of old paperwork you do not move saves time and money. Ask staff to clear their desks, shred or archive old files, and recycle or donate surplus furniture. The same approach we recommend for homes applies here, as covered in our guide to decluttering before moving.

Step 4: Pack and Label Smartly

  • Give each person a numbered or colour-coded label that matches a floor plan of the new office.
  • Label with name, department and destination zone, not just “misc”.
  • Let staff pack personal items and desk contents themselves, and keep confidential records with a responsible person.
  • If your team does not have time to pack, packing and preparation help can be arranged. See our packers and movers service.

Keep cash, jewellery and valuables out of the truck. We do not transport cash, jewellery or high-value collectibles, and those items should stay with you.

Step 5: Choose the Right Time to Move

Timing is the biggest lever you have. Strong Arm Movers can discuss early-morning, evening and weekend moving options, depending on your requirements and availability. Moving outside trading hours means customers and staff are less affected, and you are not paying people to wait around.

A common approach is to move on a Friday evening or over a weekend, so the office is ready on Monday morning. For larger workplaces, you can also move in stages, with non-critical teams first and essential teams last.

Step 6: Brief Your Removalist Properly

The more your removalist knows, the more accurate the quote and the smoother the day. Share:

  • Both addresses, floors, lifts and loading dock or parking details
  • An approximate list of desks, chairs, cabinets, boardroom furniture and equipment
  • Any heavy, fragile or specialised items
  • Building rules, such as lift bookings or insurance certificates required by building management
  • Your preferred time window

Quotes are estimates based on the information you provide, and difficult access or changes to the job details can affect the final cost. You can read our terms and conditions for details, and our moving insurance guide explains cover for your equipment. For a full overview of what we offer businesses, see our office removalists page, or the local pages for Melbourne and Brisbane.

Step 7: Run Moving Day Like a Checklist

  • Have your coordinator at the old office and a second person at the new one.
  • Confirm lifts, doors and parking are ready before the truck arrives.
  • Walk through the old office at the end to check nothing is left behind.
  • At the new office, place furniture according to the floor plan so staff can find their desks.
  • Check for damage before the movers leave. Visible damage should be reported straight away, and hidden damage within 24 hours.

Step 8: Test Before the Team Walks In

Before the first working day, test the internet, phones, printers, power points and access cards. Keep your IT contact available for the first morning. A short note to staff covering parking, entry, wifi and who to call for help sets everyone up for a calm first day. For more on the planning side, see our earlier post on relocating an office efficiently.

Conclusion

An office move does not have to cost you a day of work. Set a clear owner, get IT sorted first, declutter, label by person, and schedule the move around your trading hours. Then share accurate details with your removalist so the plan matches the reality. When you are ready, you can request a free, no-obligation quote and talk through your preferred timing with our team.

Frequently Asked Questions

How far in advance should I plan an office move?

As early as you can. Small offices may need a few weeks, while larger workplaces with IT, leases and multiple teams benefit from much longer. Book your removalist and sort out building access and IT as soon as the date is set.

Can an office be moved after hours or on a weekend?

Often yes. Strong Arm Movers can discuss early-morning, evening and weekend moving options depending on your requirements and availability, which helps protect your normal trading hours.

Who disconnects and reconnects computers and network equipment?

Usually your IT provider. Under our terms we do not disconnect or reconnect appliances or handle specialised equipment that needs licensed professionals unless agreed in writing, but we can transport computers and office equipment carefully.

What should I tell the removalist to get an accurate quote?

Give both addresses, floors and lift access, a list of furniture and equipment, any heavy or fragile items, building rules, and your preferred time window. Accurate information leads to a more realistic estimate.

How do I keep staff organised during the move?

Use a clear floor plan, label each person’s items by name and destination zone, and send a short briefing about the move date, new-office access and who to contact for help.